Hill Patching

Profile – st. Red Hill – need to restore traffic lights and make patching roads; Junction Street. Red Hill – St. Miner – is necessary to make patching roads, install manholes in accordance with the gost, the intersection of ul. Red Hill – St. Co-operative – must be make patching roads, to equip the crosswalk in accordance with GOST; Stop “House of creativity for young technicians” – to build bus shelters, install traffic signs (5.16. “stopping place bus, 5.19.1, 5.19.2 “Crosswalk”) and apply road markings 1.14.1 and 1.17; Junction Street. Red Hill – St. Marketplace – necessary to make patching roads, install manholes in accordance with GOST; from st.

Cooperative to st. Marketplace on the street. Red Hill – need to make patching roads, clear the streets of dirt; stop “clinic” – need to build bus shelters, install traffic signs (5.16. “Stopping place bus, 5.19.1, 5.19.2 “Crosswalk”) and apply road markings 1.14.1 and 1.17, to make patching, barrier fencing and footpaths brought into conformity with GOST; Stop “GBSMP them. May 1 “- need to build bus shelters, install traffic signs (5.16. “Place bus stop, 5.19.1, 5.19.2” Crosswalk “) and road markings 1.14.1 and 1.17, to make patching, barrier fencing and footpaths lead to the result compliance with the guests. The route of public transport 2 “sh. Rostov – district of Culture: Stopping the “sh. Rostov – on the turning circle to expand and repair the roadway to the street. , st. Tram – it is necessary to repair the roadway to the street.

This entry was posted in News and tagged . Bookmark the permalink.

Comments are closed.